Sierra Pacific Power Company (NV Energy) Powerline Rebuild Project - Lines 101, 102, 133
The Sierra pacific Power Company (NV Energy) proposes replacing three transmission lines (101, 102, 133) to modernize the electric design line along the existing alignment (right of way) and improve reliability within the electric power grid.
Project Summary
Location Summary:
The project runs northeast from the west side of Donner Lake to Verdi, California following the existing 101, 102, 133 powerline right of ways.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/2024 (Estimated) |
Decision | 09/2024 (Estimated) |
Implementation | 05/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Truckee Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations
Current Status:
Developing Proposal
Forests:
Tahoe National Forest
Districts:
Truckee Ranger District
States:
California
Counties:
Nevada; Sierra
Legal Land Description:
Beginning at t17N, R15E, S17 running northeast to T19N, R18E, S7.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Gabriela Yanez
10811 Stockrest Springs Road
Truckee, CA 96161
7753098096
gabriela.yanez@usda.gov
Last Updated: 5/30/2024